A buyer for 1,600-amp electrical equipment

If you have 1,600-amp electrical equipment available in Ohio, we buy surplus and used electrical equipment rather than selling equipment to you. This can be a single eligible item, a collection of spares or a larger inventory released by an upgrade or shutdown. Tell us what is available and what you know about it; an incomplete inventory can be a useful starting point.

We consider all voltage classes and make cash offers based on the actual equipment and agreed scope. Payment is upfront, before the agreed freight pickup, and the buyer covers freight. You do not have to test the equipment for us. The transaction details, including the lot and timing, are confirmed by agreement.

What a 1,600-amp label tells the buyer

A 1,600-amp marking describes a current rating, but a complete inventory also needs the manufacturer, model, voltage and equipment type. The main assembly, bus and individual breakers may carry different ratings. Record the wording on each safely accessible label rather than using the largest number on the lineup as the rating of every component.

Identify the device as well as the rating

An amperage figure alone does not establish the interrupting capacity, trip setting or value of a device. Tell the buyer whether the rating belongs to a switchgear lineup, switchboard, breaker, panelboard or another assembly. If the label is missing, share an existing schedule or mark the rating as unknown; do not remove a cover or test a device to find it.

Two useful examples of equipment to identify

A unit substation can combine transformer and switching or distribution sections, with an arrangement that varies by installation. Identify each visible section, the manufacturer and nameplate information, including primary and secondary ratings where available. State whether the transformer, switches, breakers and connecting sections are all included or only a portion is available.

A panelboard usually distributes power through a group of branch devices within an enclosure. From a safe exterior position, photograph the manufacturer's label when accessible and note the enclosure dimensions, voltage, main rating and number of panels. Existing schedules can help describe the circuit layout without requiring the seller to remove a cover or operate a breaker.

Use nameplates without opening equipment

Visible manufacturer and rating labels are valuable, but safety comes first. Photograph only what can be reached from a safe exterior position and use existing drawings or maintenance records for other details. Do not remove covers, operate switches or expose electrical parts for a better picture. When a label cannot be read, report the uncertainty rather than guessing.

Plan around a shutdown window

Where a project has a fixed outage or demolition window, share both the earliest release date and the deadline for clearing the space. Explain whether the equipment will be removed in stages or all at once. A tentative schedule is useful, but identify any approvals or utility work still outstanding so that transportation can be planned against realistic milestones.

What to send for an evaluation

Start with the equipment type, manufacturer, model or catalog number, quantity and location. Include current and voltage ratings only when they are safely visible or already recorded. A wide photograph showing the complete assembly, plus close-ups of accessible exterior nameplates, can explain a great deal. Existing drawings, a spare-parts list or an equipment schedule are helpful when available.

State what is included and excluded: complete lineups, loose breakers, accessories, covers and separately stored spares should not be assumed. Describe known damage, missing pieces, storage conditions and any known environmental concerns. If a detail is unknown, say so. The buyer can discuss the inventory without asking you to perform electrical testing.

How a cash offer and payment work

The buyer reviews the information you provide and discusses the proposed lot, condition, ownership, site access and release schedule. A cash offer reflects those facts and the anticipated handling needs; a nameplate rating by itself is not a fixed price. Ask about any item or responsibility that is unclear before accepting an offer.

Once the parties agree on the equipment, price and transaction terms, payment is upfront, before the agreed freight pickup. We handle the crane, rigging, disconnects, loading, freight and hauling. Our qualified team coordinates this work with the site after the purchase is agreed. No seller testing is required for the evaluation.

Access, release and covered freight

Tell the buyer whether the items are still installed or already staged, and give approximate dimensions and loading access. If a lineup must be separated, our qualified team coordinates the safe release plan with the facility. Keep separately stored parts associated with the correct assembly.

Provide the expected availability date, site contact, access hours and any dock, doorway, lift or staging restrictions. The buyer covers the freight for the agreed purchase; pickup planning follows the confirmed scope and the site's release requirements. If several buildings or release dates are involved, identify them separately so the parties can coordinate the actual shipment.

Electrical safety and honest condition information

Treat equipment as potentially energized until authorized, qualified personnel establish an electrically safe work condition under the applicable site procedures. Do not open covers, operate switches, remove breakers, disconnect conductors or perform tests for photographs or a quote. The seller does not need to demonstrate that an item works.

Tell the buyer about known damage, oil or fluid concerns, contamination, missing components or other restrictions, and supply existing records if you have them. Unknown condition is different from a representation that equipment works. Our qualified professionals handle safe isolation and the agreed removal work in coordination with site authorization and any required assessments.

Common questions from equipment sellers

What if there are known environmental concerns? Disclose known leaks, fluid issues, contamination or site restrictions and share existing documentation if available. Do not collect samples or disturb equipment for the buyer; qualified professionals determine any required assessment and handling.

Can I discuss equipment before it is removed? Yes. Explain whether it remains installed and give the expected release window. Our qualified team handles isolation and removal after site authorization; we can review the available information before that work is completed.

What if some breakers or covers are missing? Describe the missing components and distinguish them from parts that are stored separately. An incomplete assembly can still be submitted for review; the buyer needs an accurate list to understand the proposed lot.

Start with the equipment you have

To discuss 1,600-amp electrical equipment in Ohio, provide a short inventory, safely available label photos and your approximate timing. Include the name of the person authorized to discuss the sale and any known access constraints. The buyer can review equipment across all voltage classes and discuss a cash offer without requiring seller testing.